plop SPACEPHOTOS
 Untitled Document




   Home » Ref S05628 (detail)

 
My Light Box / Estimate Request : 0 image(s)
Alternate choice of images for this theme
                        
Save this image free of charge
in 800 pixels for layout use
(right click, Save as...)



Ref : S05628

Theme : Space Shuttle - General  (1045 images)

Title : Just after departing the Vehicle Assembly Building

Caption :

(03/25/2000) --- Just after departing the Vehicle Assembly Building, the Space Shuttle Atlantis aboard the crawler-transporter wends its way to Launch Pad 39A. The crawler-transporter carries its cargo at 1 mph, taking about five hours to cover the 3.4 miles from the Vehicle Assembly Building to the launch pad. A leveling system on the crawler-transporter keeps the top of the Space Shuttle vertical, especially negotiating the ramp leading to the launch pads and when it is raised and lowered on pedestals at the pad. Liftoff of Atlantis on mission STS-101 is scheduled for April 17 at 7:03 p.m. EDT. STS-101 is a logistics and resupply mission for the International Space Station, to restore full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda